Brocks Gap Eye Care

Brocks Gap Eye Care was a 3,200 SF buildout located in the Brock’s Gap development. The buildout had metal framed walls and a full MEP package. Finishes included LVT flooring, a complete millwork package of cabinets, and solid surface countertops. The lobby, offices, and exam rooms all present a clean, modern look.


Waldo’s Chicken & Beer

The build out for the Cahaba Heights location of Waldo’s Chicken was a 3,100 square foot interior fit out that included a new kitchen, top-of-the-line bar, and two dining areas. The bar includes wood wall paneling, a hanging TV rack, a quartz countertop island, and three roll up doors . The ceilings are a mix… Read more »


Creekside BBQ

Creekside BBQ at Oak Mountain was a complete gut and remodel of a former Waffle House situated along Bishop Creek with a unique outdoor dining experience. It is conveniently located to serve the Pelham community, Oak Mountain Stain Park, and the Oak Mountain Amphitheater. The renovations include custom accommodations for a Texas-made Oyler 700 smoker… Read more »


Grande View Living

700 Corporate Ridge Drive Birmingham, AL 35242 Grande View Living is a 48,500 SF Senior Living facility located on Highway 280 overlooking Meadow Brook. It boasts a complete and total renovation of 86 units, and includes two Assisted Living Wings and a Memory Care Wing. It has a full-scale commercial kitchen, a beverage bar in… Read more »


Bodnar Investment Group Office

This 3,100 square-foot new office buildout is for Bodnar Investment Group in Cahaba Heights, Alabama. This office consists of 6 offices, 2 conference rooms, open office space for cubicles, and a break area. This project was constructed using structural steel and infilled with metal studs. Exposed ceilings were painted, a large suspended barn wood ceiling… Read more »


Briarwood Art Classroom

The Briarwood Art Classroom is a 2,900 square-foot renovation, creating a wide-open classroom. Three existing classrooms were opened up to accomplish the open-concept feel.  The renovation included replacing the VCT floor with a new stained concrete floor finish, opening up a new exposed ceiling concept, and new lighting throughout the classroom and corridors.  An operable… Read more »


Taziki’s Corporate Office

This 4,435 sqft new office buildout is for Taziki’s Corporate offices in the Cahaba Heights, Alabama area. It consists of 11 offices, 2 conference rooms, a break room, call center, and open office area. This project was constructed using structural steel and infilled with metal studs. Exposed ceilings were painted in the corridors and all… Read more »


Russell Speed Shop

The old Russell Speed Shop building was renovated into a new mixed use retail space able to accommodate retail, office, and food service tenants. The project consisted of interior and structural demolition with exterior and site improvements. The building now has three tenant spaces with six restrooms, new storefront windows, patios, open air seating, and… Read more »


Grand South Senior Living

Project is a one story facility with mechanical mezzanine, and two story non-occupied features located in Dothan AL – includes both an Assisted Living Facility (ALF) and a Specialty Care Assisted Living Facility (SCALF) with a total of 40 ALF units, and 40 SCALF units and supporting areas ( Kitchen, Dining Facilities, Activity /Chapel, Salon,… Read more »


Villages of South Walton

The Villages of South Walton consists of four condo complexes located in Rosemary Beach, Fl totaling approximately 200,000 Sf. The community includes a courtyard in the center of the units surrounded retail stores located on the first floor of the condominium buildings. The retail spaces include a general store, merchandise shops and restaurants. It is… Read more »